top of page

Road Closure Notice For South Hall Street in Valentine

  • 1 day ago
  • 1 min read
The temporary closure is due to the implementation of the new interceptor sewer system being built.
The temporary closure is due to the implementation of the new interceptor sewer system being built.

The City of Valentine is advising motorists of a temporary closure of Hall Street in

connection with construction of the City's interceptor sewer project.


South Hall Street is closed through the construction area between Highway 20 and

South Street. Motorists traveling to and from Miller Field should use Airport Road

and South Street as the detour route.


Access to Development Street will be maintained using temporary gravel access along

the east side of Hall Street. The temporary gravel route is for Development Street

access and is not an airport detour.


Drivers should follow all posted detour signs, barricades and traffic-control

devices and use caution around the construction area.


The closure and traffic-control configuration may change as construction progresses.

The City appreciates the public's patience and cooperation during the project.


bottom of page